on Lake Gaston The Merrymount Home Owners Association would like to welcome you to our community. To aid you in building your new home we have devised the following checklist. This does not replace the covenants and it is highly recommended that all lot owners refer to the Protective Covenants for further detail. 1.0 FEES TO PROPERTY
OWNERS ASSOCIATION 1.2 IMPACT FEE ON
NEW CONSTRUCTION 1.3 WATER CONNECTION
CHARGE 2.0 CONSTRUCTION
2.1 LOTS 1-129 2.2 LOTS 201-213 2.3 All dwellings must have a solid exterior, weight bearing walls, footers, and foundations. 2.4 All building materials must be new or structurally sound 2.5 The exterior construction of all improvements upon any residential lot and all grading, Landscaping and seeding shall be complete within one year from commencement of construction 3.0 MAIN FLOOR 3.1 Must be supported by and constructed on continuous weight bearing exterior walls (interrupted only by enclosed windows, doors or garage doors) built on a continuous footer to meet requirements of the applicable state and county building codes 3.2 The main floor may be constructed, in whole or in part, on a concrete slab poured on grade 3.3 The bottom of the foundation sill plate located on top of the foundation wall must be at least two feet above ground level at every point when neither basements nor concrete slabs are employed in the construction technique 4.0 STRUCTURE 4.1 All buildings for human habitation and other freestanding structures erected on any lot shall be of conventional "stick built", "panelized" or "modular" on site construction. 4.2 ROOF 4.2.1 LOTS 1- 129: At least 70% of the roof of any structure having less than 1751 square feet enclosed heated living area shall have a minimum slope of 6/12 and a minimum 12 inch overhang over each end and side wall. 4.2.2 LOTS 201- 213: At least 70% of the roof of any structure having less than 2163 square feet enclosed heated living area shall have a minimum slope of 6/12 and a minimum 12-inch overhang over each end and sidewall. 4.3 EXTERIOR 4.3.1 All dwellings for human habitation and all other free standing structures erected on any lot in the Subdivision shall have solid exterior, weight bearing footers, foundations and walls 4.3.2 Exterior walls shall be brick, wood, aluminum, vinyl, masonite, dryvit or stucco. 4.3.3 Concrete or similar blocks may be used for foundations but they shall not be employed as "above ground" exterior walls unless they are fully and permanently finished with stucco, brick or stone veneer. 4.4 SETBACKS 5.0 UTILITY AND
DRAINAGE EASEMENTS 6.0 HEALTH, SAFETY and REPAIR 6.1 OSHA requires that construction sites provide toilet facilities for workers. If no such permanent facility is available, a portable facility is to be provided (e.g. Porta-John, etc.) by the contractor. This portable facility shall be located 100 feet from the street and at least 20 feet from any adjacent developed lot sideline. 6.2 The MPOA requires that a trash receptacle with a tight fitting lid be provided on-site for food and drink remnants to reduce the occurrence of wild animals and local pets scavenging through the work site and either becoming ill from spoiled food or scattering the trash throughout the neighborhood. 6.3 The impact fee you paid when your building permit was issued was to cover normal wear and tear on the road system because of construction vehicles. However, contractors will be responsible for repair of any specific damage done by their equipment. Such repair will be completed within a reasonable length of time or the Association will order the repair and submit the costs to the contractor and homeowner for payment. As the homeowner, you are ultimately responsible for the repair, so please ensure your contractor is aware of this responsibility. 7.0 OTHER STANDARDS AND GUIDELINES 7.1 In order to maintain the natural beauty of Merrymount and attempt to afford sight isolation between homes, Lot clear cutting (denuding) will not be allowed. A fifteen (15) foot access driveway to construction site, a ten (10) foot buffer around the home footprint and the septic field area are allowable exceptions to clear cutting. Removal of dead or diseased trees and underbrush is encouraged by the ACC. It is desirable to keep as many trees of six (6) inch caliper, measured at a level of four (4) feet above ground plain, along side lot lines and between street and house. All debris created from clearing the home site must be hauled away. Open fires are not allowed. 7.2 A construction driveway, coincident with final driveway location, must be installed prior to lot clearing and will consist of a minimum of # 2 or larger gravel applied into lot a sufficient distance to eliminate or greatly minimize mud from being tracked onto streets. Integrity of the roadway storm water control ditches must be maintained by installing a suitable culvert pipe in the drainage ditch. At time of building construction start this construction drive must be extended up to the building footprint. This driveway must be at least twelve (12) wide and be maintained (addition of new stone as required) over entire construction period. 7.3 Construction debris fencing or a commercial dumpster must be on site prior to building construction start date. Debris fencing in lieu of dumpsters can be employed to contain construction debris from being distributed to adjacent lots or streets. Debris must be periodically hauled away from the site. No construction debris burning will be tolerated. Personal trash (food and drink remnants) may only be burned in large metal barrels or drums while workers are actively on site. 7.4 Silt fences shall be installed prior to or at time of lot clearing to reduce erosion onto streets, adjacent lots or into Lake Gaston. These fences must be maintained in functional order over the entire construction period until permanent solutions are installed. Lot Owner/Builder is responsible for storm water runoff control by installing positive control devices to prevent drainage from lot and home site improvements to the street, Lake Gaston or adjacent Lots. 7.5 Installation of High intensity "dusk to dawn" outside security lighting is not allowed. 7.6 Merrymount Property Owners Association and the Architectural Review Committee have no jurisdiction over the construction of boat docks. Property owners should contact Dominion Power directly for guidance and directions. 8.0 ARCHITECTURAL REVIEW COMMITTEE 8.2.1 The ARC will consider comments and concerns received from those adjacent neighbors whose view is impacted. 8.3 The ARC will review requests for all fence construction with recommended fence varieties that maintain the aesthetics and beauty of Merrymount . 8.4. Shed and outbuilding construction regulations: 10.0 GRANDFATHER CLAUSE 11.0 LOT OWNER/BUILDER ACKNOWLEDGEMENT Lot owner signature: ____________________________ Builder signature: ____________________________ Date: ___________________ PROPERTY
OWNER'S NAME_____________________________________________
3. A building permit and inspection by the County Building Department may be required. 4.
Should the Architectural Committee deny your request, you may appeal
the decision in person at the Merrymount Property
Owners Association Board of Directors. SIGNED:
_________________________________
(by owner) //////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// Comments
____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ The
Architectural Committee recommends the following on this request: (c)
2005-2011. Merrymount Property Owners Association. All rights reserved. |